12th Street Improvements, Grand Junction, CO
- Owner Reference
- : 8011-26-1
- Bid Date
- Jun 15, 2026 at 08:00pm
- Questions Due By
- 6/9/2026 at 9:00am
- Pre-Bid
- Recommended - 6/8/2026 @ 08:00am @ (for location please or )
- Estimate
- 446,375.00
- Owner
- Colorado Mesa University, CO
- Trades
- CO-12 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, CO-01 - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- New Construction, Addition, Expansion
- Duration
- Anticipated Construction Finish 8/10/2026 (7 weeks)
Description
The project proposes construction of a new pedestrian crossing on 12 th Street north of Mesa Avenue, that will connect to a new concrete sidewalk between the existing parking garage and Unity Field stadium. The new crossing and sidewalk will provide a protected pedestrian walkway between the Mav Center and large parking lot located east of 12th Street, north of Mesa Ave., south of Orchard Ave.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 827912 | Published 6/7/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208