#818093 Posted 4/8/2026

**Project Reopened - Revised Timeline: Seepage Stormwater Pump Station, Pembroke Pines, FL

Owner Reference
PSPW-25-12
Bid Date
Jul 14, 2026 at 02:00pm
Questions Due By
June 28, 2026, 11:00pm
Pre-Bid
MANDATORY - 6/18/2026 @ 10:00am @ (for location please or )
Estimate
$5,588,742.50
Owner
City of Pembroke Pines, FL
Trades
Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF), Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), Generator Contractor: Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems, Supervisory Control & Data Acquisition (SCADA): Real-Time Data Utility Automation, Controllers/Timing, Remote Terminal Unit RTUs, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
270 days

Description

The City of Pembroke Pines is seeking bids from qualified firms, hereinafter referred to as the Contractor, to construct a stormwater pump station and associated utility improvements, including all labor, materials, equipment, permitting, and coordination necessary to complete the work, in accordance with the terms, conditions, and specifications contained in this solicitation. A. The utility work shown on the drawings includes the design and construction of a stormwater pump station located near the western limits of the City of Pembroke Pines. The project includes the installation of a duplex submersible pump system to re-channel seepage from Conservation Area 3A into the Everglades via the SFWMD S-9A Pump Station. Work includes site grading, construction of a pump station wet well, installation of electric pumps, control panel, automatic transfer switch (ATS), permanent backup generator, associated electrical improvements, hydraulic piping, SCADA accommodations, and discharge connections. Additional work includes permitting, environmental coordination, paving, restoration, and coordination with multiple regulatory agencies including SFWMD, SBDD, FDOT, and FDEP. B. The work associated with this project involves active force mains that are within the Rights-Of-Way (ROW) or property owned by the City. All work activities shall be required to be in accordance with the permits issued by the respective agencies. All work performed will be required to be done while maintaining the functional operation of the utility lines. C. All materials, equipment, skills, tools, and labor which is reasonably and properly inferable and necessary for the proper completion of the Work and in compliance with the requirements stated or implied by these Specifications or Drawings shall be furnished and installed by the CONTRACTOR without additional compensation, whether specifically indicated in the Contract Documents or not. D. Repair, replace, or otherwise settle with the OWNER or OWNERS Representative, if damage to property or existing facilities occurs, including damage to pavements, utilities, lawns, structures, etc. E. Construct the Project under a Unit Price Contract. F. The CONTRACTOR shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, clean up, replacements, and restoration required because of disruptions caused during this construction. G. Any damage that occurs through the fault of the CONTRACTOR, shall be completely restored at the expense of the CONTRACTOR, based upon current City standards. H. Pipe Manufacturer shall provide training for CONTRACTORS personnel on the proper methods of handling, installing, joining and backfilling of all mains. I. Contractor shall verify location and depth of existing utilities to determine actual need for utility line transitions. If existing mains are not in conflict with proposed force main, then the transitions will not be required. Please refer to Attachment A - Specifications - SECTION 01010 "SUMMARY OF WORK" for further details.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 818093 | Published 4/8/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208