#826804 Posted 6/1/2026

Florence A. De George Boys and Girls Club Addition - CDBG, Davie, FL

Owner Reference
ITB# RS-26-36
Bid Date
Jul 1, 2026 at 02:00pm
Questions Due By
June 16, 2026, 5:00pm
Pre-Bid
MANDATORY - 6/8/2026 @ 02:00pm @ (for location please or )
Estimate
$1,582,928
Owner
Town of Davie, FL
Trades
CGC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, CF, Master Plumber - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl, Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), Audio/Visual (AV) Contractor: Video Conferencing, Sound & Speakers, Cameras, Intercom, CATV, Public Address (PA) System, Master General Mechanical - Mechanical Contractor: MEP Contractors (Combined Mechanical, Electrical, Plumbing, HVAC, Fire Suppression Trades)
Phase
New Construction, Addition, Expansion
Duration
180 days

Description

The Boys and Girls Club has offices, classrooms, meeting rooms, a library, exercise rooms, a gym, storage areas, a mechanical equipment room, a kitchen, restrooms, electrical rooms, corridors and a lobby. The facility also has a backyard and landscape. New construction will provide separate new spaces for teenagers, including a vestibule, a studio, a control booth, an edit room, a study room, a lounge area, a computer lab and a gaming area. Disciplines of work include civil, architectural, structural, electrical, mechanical, fire alarm and fire sprinkler system, and landscape. This project involves approximately 1,810 SF addition to the existing Boys and Girls Club building as well as partial interior demolition of existing non-load bearing construction, interior finishes, ceilings, and other elements to prepare the existing space for new construction. The project area of the proposed work is approximately 2,780 SF. Awarded Contractor will be required to implement a phasing plan during demolition and construction as well as interior temporary walls to separate the project area from the rest of the facilities that will remain operational during construction. Contractor's and subcontractor's crews will need to meet certain requirements applicable to Community Development Block Grants (CDBGs). Also, submittal of payroll information for all crews will be required with each application for payment. The Bid Form includes the bid items and several add-alternate items. The estimated budget for this project is $1,582,928. Bidders are required to submit a 5% bid bond. If recommended for award, bidder is required to submit a 100% payment and performance bond.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 826804 | Published 6/1/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208