Construction Engineering And Inspection (CEI) Services For The NW 1st Street Complete Streets Improvement Project (LAP), Dania Beach, FL
- Owner Reference
- 26-016
- Bid Date
- Jul 16, 2026 at 12:00pm
- Questions Due By
- July 6, 2026, 12:00pm
- Owner
- City of Dania Beach, FL
- Trades
- Construction Engineering & Inspection Services (CEI) / Division of the State Architect (DSA) Construction Building Inspections, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Contracted Services & Suppliers
Description
3.2. SCOPE OF SERVICES The scope of services is a general guide to the work the City expects to be performed by the Consultant and is not a complete listing of all services that may be required or desired. The City desires to improve roadway conditions to improve capacity and allow citizens to safely walk/bike to schools and bus stops. The improvements sought include, but are not limited to bike lanes, pedestrian traffic signals, sidewalk repairs, and sidewalk harmonization. Proposers and subconsultants must be FDOT Certified in the following work groups and capable of providing quality delivery of these services: o Work Group 10: Construction Engineering Inspection: 10.1 Roadway Construction Engineering Inspection The City intends to contract with a qualified firm for CEI services which include, but are not limited to: A. General - It shall be the responsibility of the Consultant to administer, monitor, and inspect the Construction Contract such that the Project is constructed in reasonable conformity with the plans, specifications, and special provisions as prepared by the Engineer of Record. 1. The Consultant shall observe the Contractors progress and quality of work and identify discrepancies, report significant discrepancies to the City, and notify the Contractor of such observed discrepancies and document the outcome of the discrepancy. 2. The Consultant shall advise the City Project Manager of any significant omis-sions, substitutions, defects, and deficiencies noted in the work of the Contractor and any corrective action that has been performed by the Contractor. B. On-site Inspection - The Consultant shall monitor the Contractors on-site construction activities and inspect materials entering into the work in accordance with the plans, specifications, and special provisions for the Construction Contract to determine that the Project is constructed in reasonable conformity with such documents. 1. The Consultant shall monitor all off-site activities and fabrication. 2. The Consultant shall keep detailed accurate records of the Contractors daily operations and of significant events that affect the work. 3. Consultant shall be responsible for monitoring and inspection of the Contractors Work Zone traffic control plan and review of any modifications to the Work Zone Traffic Control Plan, including alternate Work Zone Traffic Control Plan, in accordance with the latest FDOTs procedures. Consultant employees performing such services shall be qualified in accordance with the FDOTs procedure. C. Materials Sampling and Testing Duties The Consultant shall perform sampling and testing of component materials and completed work in accordance with the Construction Contract documents. 1. The minimum sampling frequencies set out in the FDOTs Materials Sampling, Testing and Reporting Guide shall be met. In complying with the aforementioned guide, the Consultant shall provide daily surveillance of the Contractors Quality Control activities at the project site and perform the sampling and testing of materials and completed work items that are normally done in the vicinity of the Project for verification and acceptance. 2. The Consultant shall be specifically responsible for verification sampling and testing to determine the acceptability of all materials and completed work items on the basis of either test results or verification of a certification, certified mill analysis etc. 3. The City will monitor the effectiveness of the Consultants testing procedures through surveillance and obtaining and possibly testing independent assurance samples. 4. Sampling, testing and laboratory methods shall be as required by the FDOTs Standard Specifications, Supplemental Specifications or as modified by the special provisions of the Construction Contract. 5. Documentation reports on sampling and testing shall be submitted to responsible parties within a
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 830208 | Published 6/24/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208