Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#827114 Posted 6/2/2026

Western Service Area Force Main Extension And Lift Stations, Fellsmere, FL

Owner Reference
2026-01-0-2026/CR
Bid Date
Jun 19, 2026 at 03:00pm
Pre-Bid
Strongly Encouraged - 6/4/2026 @ 03:00pm @ (for location please or )
Owner
City of Fellsmere, FL
Trades
CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, CU - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The project scope includes 5,831 linear feet of 8-inch C-900 PVC Force Main, 7,566 linear feet of 8-inch DR11 HDPE force main directionally drilled, 1,043 linear feet of 8-inch DR11 HDPE force main directionally drilled at (canal), and 801 linear feet of 8-inch PVC DR18 gravity sewer.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 827114 | Published 6/2/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208