Boston Hwy (CR 149) Phase I and II from US 19 to S Gilley Rd, Monticello, FL
- Owner Reference
- 2026-09
- Bid Date
- Jun 4, 2026 at 03:00pm
- Questions Due By
- May 22nd, 2026
- Owner
- County of Jefferson
- Trades
- CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
This project is for the construction services for widening and resurfacing and widening of CR 149 Boston Highway from SR 57 (US 319) FL/GA Parkway to Still Road. The scope will include (2) 12' travel lanes and 3' paved shoulders. Drainage improvements will include evaluating all driveway side drain pipes and miter-end sections due to their condition and to keep drainage connectivity, as needed. Signage exists within the project limits and will be evaluated to determine the need for additional signs, correcting redundant or conflicting signage and the replacement of existing signage, as needed. New thermoplastic striping and RPM's will also be included in the project. All work will be completed within existing right of way.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 822732 | Published 5/6/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208