Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#826543 Posted 5/29/2026

**Canceled** 12th Street Shoreline Stabilization Project, Clermont, FL

Owner Reference
26-093
Bid Date
Jun 25, 2026 at 02:00pm
Questions Due By
June 17, 2026, 3:00pm
Pre-Bid
MANDATORY - 6/8/2026 @ 10:00am @ (for location please or )
Estimate
$100,000
Owner
City of Clermont, FL
Trades
Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Sand Bags, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The City of Clermont is seeking a qualified contractor to stabilize approximately 700 linear feet of eroded shoreline/slope along the lakeside of the South Lake Trail / Lake Apopka Trail corridor adjacent to 12th Street near West Beach / Lake Minneola Drive.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 826543 | Published 5/29/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208