Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#817341 Posted 4/3/2026

Consumer Line Relocation Program at Various Locations MD-County 2025 - Part 2, Miami, FL

Owner Reference
RPQ No P20383
Bid Date
May 9, 2026 at 10:00am
Pre-Bid
MANDATORY - 4/9/2026 @ 10:00am @ (for location please or )
Estimate
$2,895,800
Owner
County of Miami-Dade
Trades
CF, Master Plumber - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), CGC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
250 days

Description

This work involves disconnecting existing water meters from the service water lines located at the rear or side of the properties and connecting new water service lines of the residences to the existing water meter at the front of the property, as shown on the attached sketch in the appendices. The Contractor shall meet the property owners/tenants where the conversion will be performed, and the property owner shall have the opportunity to review the proposed route and provide their input. The contractor shall obtain the owner's signature for all required permits and shall be responsible for applying for and obtaining the required permits, including preparing the plumbing/electric permit application, pulling plumbing/electric permits, and any other required permits from the Building Office of the municipality in which the work is to be performed. The Contractor shall furnish all materials, labor, and equipment as specified or necessary for a complete Project including but not limited to trench excavation, placing a sand/fine gravel bed on the bottom of the trench for pipe bedding, furnishing and installing the new water service from the new water meter located in front of the property to the existing household potable water system connection point, which includes copper pipes, tubing, fittings, valves, PVC valve boxes, grounding system (where applicable) and the installation of the new vacuum breaker at each existing and new hose bibb; furnishing and installing backflow prevention devices where applicable, install all piping, fittings, valve box and accessories to connect irrigation meter/submeter where existing, performing pressure tests on the new water service pipe, flushing, disinfecting the new service line, disposing of super chlorinated water properly, backfilling and compacting the trench, cutting and plugging existing water service line(s) located inside of the property, removing and disposing of the existing water meter box, filling void (at the abandoned 1-inch wing style angle stop valve) with ready mix concrete to 2-inches above the existing and to be abandoned 1-inch wing style angle stop valve, placing top soil on top of concrete and laying sod as needed to cover area or the necessary material to match the existing condition at this location, performing final cleanup/restoration and landscaping of the disturbed areas to equal or better condition. The Work also includes the safety and protection of the homeowners property, coordinating and obtaining necessary inspections from the Building Office of the municipality in which the work is to be performed, proper disposal of removed materials and other appurtenant and miscellaneous related items, and completion of the work for a finished project

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 817341 | Published 4/3/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208