#822360 Posted 5/5/2026

Pump Station No. 0348 Emergency Generator Relocation, Miami, FL

Owner Reference
RPQ No P16370
Bid Date
Jun 10, 2026 at 10:00am
Pre-Bid
MANDATORY - 5/12/2026 @ 10:00am @ (for location please or )
Estimate
$1,348,873
Owner
County of Miami-Dade
Trades
Generator Contractor: Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems, Master General Mechanical - Mechanical Contractor: MEP Contractors (Combined Mechanical, Electrical, Plumbing, HVAC, Fire Suppression Trades), Concrete Repair & Restoration Services, including Gunnite & Grouting Contractor, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, Tide Gates, CGC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
330 days

Description

1.1 SCOPE OF WORK A. This Section describes the project in general and provides an overview of the extent of the work to be performed under this Contract. Detailed requirements and extent of work is stated in the applicable Specification sections and shown on the Plans. The Contractor shall, except as otherwise specifically stated herein or in any applicable parts of the Contract Documents, provide and pay for all labor, materials, equipment, tools, construction equipment, and other facilities and services necessary for proper execution, testing, and completion of the work under this Contract. 1.2 SPECIFICATIONS A. The Specifications included in these Contract Documents establish the minimum performance and quality requirements for materials and equipment with the minimum standards for quality of the workmanship and appearance. Generally, there has been no attempt to separate the Specification sections into groups for the work of separate subcontractors, or for work to be performed by the various trades. Should there be any question as to the interpretation of any particular Specification section or part of Specification section, such question should be directed to the Department prior to the submittal of a proposal for the work under this Contract. B. The work shown on the Plans is intended to be comprehensive and descriptive, not an exact and complete representation of the actual finished work. Installed work shall include fittings, joints, supports, nuts, bolts, and all other accessories required to provide complete and satisfactory systems as specified, even though some items may not be specifically shown on the Plans. C. It is the intent of WASD to obtain a complete functional, satisfactory and legally operable installation under this project, and any items of labor, equipment or materials which may be reasonably assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein. The Contractor shall provide all materials for the project unless they are specifically called out in these specifications as being supplied by the Department. The Contractor shall also supply all other labor, material or equipment required to preclude damage to or loss of functionality of any existing facility or system. D. No request for additional compensation or Contract time (except for a non-compensable item extension at the sole discretion of the Engineer, whose decision shall be final) resulting from encountering utilities or structures not shown, or differing in location or elevation from that shown, will be considered. The Contractor shall explore sufficiently ahead of the Work to allow time for any necessary adjustments without delay to the progress of the installation. Cost due to delays occasioned by encountering utilities or structures which could have or should have been discovered by timely exploration ahead of the work shall rest solely with the Contractor. 1.3 REASONABLY IMPLIED PARTS OF THE WORK SHALL BE DONE THOUGH ABSENT FROM SPECIFICATIONS A. Any part of the work which is not mentioned in the Specifications but is shown on the Plans, or any part not shown on the Plans but described in the Specifications, or any part not shown on the Plans nor described in the Specifications, but which is necessary or normally required as a part of such work, or is necessary or required to make each installation satisfactorily and legally operable, shall be performed by the Contractor as incidental work without extra cost to WASD, as if fully described in the Specifications and shown on the Plans, and the expense thereof shall be included in the applicable unit prices or lump sum bid for the work. 1.4 DESCRIPTION OF WORK A. The project consists of furnishing all materials, labor and equipment necessary to remove existing generator from interior of building at Sewage Pump Station No. 348 and install a new self-enclosed generator outside of the building on the north side, the work includes but it is not limited to, excavation, demolition and modification work; removal of existing generator and auxiliary systems , fuel piping and fittings; removal of existing louver and infill of opening; removal, transport, salvage and legal disposal of demolition material and equipment; transportation and handling costs, including removal of salvaged equipment to a location designated by the Engineer; furnish and install new generator and generator auxiliary systems, furnish and install new aluminum fence; furnish and install new generator concrete slab; temporary and permanent replacement of any sod, sidewalk, pavement and/or driveway damaged by construction; site restoration; and other appurtenant and miscellaneous items and work for a complete, satisfactory and functional installation. Sewage Pump Station No. 348 located at 5700 E 8th AVE, Hialeah, Florida 33013, Section 32, Township 52, Range 41. 1. Structural and Architectural: a. Removal of louver, exhaust pipe, and existing generator concrete pad in the Generator room. b. Infill opening of louver and exhaust pipe and repair floor. c. New piping and equipment support. d. Installation of generator equipment concrete slab 2. Electrical: a. Removal of existing generator feeder to ATS and ATS control wiring. b. Installation of new generator. c. New generator remote control panel. d. New power conductors in existing raceways between new generator and existing automatic transfer switch. e. New generator grounding system. f. Installation of required control and monitoring signals between generator control panel, ATS, pump controller and RTU. 3. Mechanical: a. Install new fuel piping and all appurtenances from the new generator to the existing fuel storage tank. 4. Civil: a. Removal of the existing Generator from the building and legal disposal. b. Removal of the existing chain link fence in the proposed easement area for the new generator. c. Installation of new chain link fence around proposed easement. d. Site restoration to restore the finished site to pre-construction condition. B. It is the intent of the Department to obtain a complete and working installation under this Project and any items of labor, equipment or materials which may reasonably be assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 822360 | Published 5/5/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208