Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#824035 Posted 5/14/2026

Dade Boulevard Pathway Improvements, Miami Beach, FL

Owner Reference
2026-298-MP
Bid Date
Jun 29, 2026 at 03:00pm
Questions Due By
06/15/2026 05:00 PM EDT
Pre-Bid
Recommended - 5/28/2026 @ 02:00pm @ (for location please or )
Estimate
$1,204,032.00
Owner
City of Miami Beach, FL
Trades
Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, Signs & Signage Contractor: (Non-Electrical & Electrical) Digital & Video Displays, Tower Clocks, Billboards, Scoreboards, Wayfi, Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
330 days

Description

The project consists of improving the pedestrian pathway along the south side of Dade Boulevard, from Alton Road to Convention Center Drive. The work follows the existing sidewalk alignment and includes upgrades at the associated street crossings. These improvements support the goals of the Citys Transporation Department Bicycle and Pedestrian Master Plan by enhancing safety and connectivity along this corridor. The scope of services for this project includes improvements and repairs to existing concrete sidewalks; removal of asphalt sidewalks and replacement with new concrete sidewalks; milling, resurfacing and stripping of asphalt at designated intersections as needed; removal of specified street signage; installation or removal of concrete pads for benches and trash receptacles; repairs to street light bases and pull boxes; repairs to manhole concrete collars and lids; and pavement marking repairs throughout the project area.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 824035 | Published 5/14/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208