Facade Replacement at Normandy Shores Golf Club, Miami Beach, FL
Owner Reference
26-1720-024
Bid Date
Jun 9, 2026 at 10:00am
Questions Due By
10:00 AM ET on June 2nd, 2026
Estimate
$180,000.00
Owner
City of Miami Beach, FL
Trades
CGC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
210 days
Description
Scope of Work: 1. Project Overview This project covers the removal and replacement of the existing faade molding at the NSGC Clubhouse. The intent is to restore the exterior architectural appearance, address any deterioration, and ensure long-term durability using approved materials and installation methods. 2. Work Included 2.1 Site Preparation Conduct a visual inspection of the existing faade molding to confirm all areas requiring replacement. Protect adjacent surfaces, landscaping, walkways, and entryways. Install temporary barriers, caution tape, or signage to maintain safe access for members and staff. 2.2 Demolition & Removal Carefully remove all existing faade molding identified for replacement. Remove loose, damaged, or deteriorated substrate materials as needed. Dispose of all debris off-site in accordance with local regulations. 2.3 Substrate Repair (as needed) Inspect underlying sheathing, framing, or stucco for moisture damage or structural issues. Notify owner/representative of any unforeseen conditions requiring additional work. Perform minor patching or leveling to ensure a proper surface for new molding installation. Prepare wall section with bear block/CMB/Stucco for applicable vertical waterproofing system. Apply vertical waterproofing system with a 10 year manufactures warranty. 2.4 Installation of New Faade Molding Supply and install new exterior-grade molding matching the existing profile, dimensions, and architectural style (or as otherwise approved). Use weather-resistant materials such as PVC, composite, polyurethane. Secure molding using manufacturer-recommended fasteners and adhesives. Seal all joints, seams, and penetrations with exterior-grade caulking. Provide material specifications with bid submission. 2.5 Finishing Prime and paint the new molding to match the existing clubhouse color scheme. Ensure smooth transitions between new and existing surfaces. Perform touch-ups on adjacent areas affected during installation. All work around roof system/flashing to comply with FBC2023. Contractor to repair any/all damages to existing roof system caused by Faade work.
Bonds required.
Contact
or
to view contact name.
or
to view phone number.
or
to view email address.
Plans & Specifications
or
to view plans and specification details.
CBS ID: 825261 | Published 5/21/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208