Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#829347 Posted 6/17/2026

Northeast Transfer Station Facility Improvements Phase II - Compactors Bldg Tipping Floor Roof, Miami, FL

Owner Reference
RPQ No 18652-26
Bid Date
Jul 20, 2026 at 02:00pm
Pre-Bid
MANDATORY - 6/24/2026 @ 10:00am @ (for location please or )
Estimate
$614,297
Owner
County of Miami-Dade, FL
Trades
Structural Steel & Steel Erection Contractor, CC - Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards, Concrete Repair & Restoration Services, including Gunnite & Grouting Contractor, CGC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
120 days

Description

Project Description The purpose of the project is to construct a new steel roof deck above the compactors building tipping floor, modify existing steel joists to support additional wind loads, and repair the concrete corbel and masonry wall cracks. Work to be performed includes, but is not limited to, the following: 1. Corbel Repair Remove the steel travel beam for reuse Remove the existing corbel Add reinforcing steel Form and place new concrete 2. South Faade Crack Sealing Remove stucco in a limited area Rake joints in the existing Concrete Masonry Unit (CMU) faade using gouging tools Insert reinforcing steel and grout the joints Repair stucco and paint the affected area from corner to corner 3. Retrofit Existing Roof Structure Remove existing roofing materials Clean all framing Install new framing where noted Prime and paint steel Install the new roofing system Additional Information The Contractor shall coordinate with the Facility Supervisor and the Engineer of Record (EOR) to phase the work in a manner that minimizes impacts to facility operations, equipment, and vehicle circulation. Hours of operation will remain unaffected during construction. Work Restriction: Maintain uninterrupted truck access to the existing surge pit throughout construction. Provide phased construction sequencing to ensure continuous access.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 829347 | Published 6/17/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208