Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#829488 Posted 6/18/2026

A/E-Hialeah Senior High School Partial Replacement, Remodeling And Renovations, Miami, FL

Owner Reference
RFQ 211-0-2026/CV
Bid Date
Jul 21, 2026 at 01:00pm
Pre-Bid
MANDATORY - 6/30/2026 @ 10:00am @ (for location please or )
Owner
School Board of Miami-Dade County, FL
Trades
*A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, CGC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
Phase
Contracted Services & Suppliers

Description

The primary objective of this project is to reimage, modernize, and transform the Hialeah Senior High School campus into a sustainable, 21st-century educational facility. In accordance with the campus Masterplan and Facilities List, the comprehensive scope of work includes: Demolition: Complete demolition, utility extraction, and full site restoration of Buildings 02, 05, 06, 07, 10, and 11, while maintaining continuous, isolated campus operations. New Construction: Delivery of a new Administration/Student Services wing, entry plaza, neighborhood landmark marquee, fully equipped Main Cafeteria/Kitchen, Gymnasium, four outdoor basketball courts, a central courtyard with an outdoor amphitheater, new roadways, parking areas, and a secure outer perimeter fence line. Renovations (Buildings 01, 03, & 04): Facade modernization for Building 01. Comprehensive structural and building systems upgrades, selective interior finishes, re-roofing, and water infiltration remediation for remaining structures, alongside site-wide playfield improvements. Remodeling: Conversion of Building 01's vacated kitchen into an Industrial Ed/Culinary facility, transformation of the old admin suite into a Commercial Art Lab, and build-out of Building 03 to feature an ADA-compliant ESE suite and new 2nd-floor classrooms.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 829488 | Published 6/18/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208