Consumer Line Relocation Program at Various Locations MD-County 2026 Part 3, Miami, FL
- Owner Reference
- RPQ No P20400
- Bid Date
- Jul 21, 2026 at 10:00am
- Pre-Bid
- MANDATORY - 6/25/2026 @ 10:00am @ (for location please or )
- Estimate
- $2,181,800
- Owner
- County of Miami-Dade, FL
- Trades
- CF, Master Plumber - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, CU - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 180 days
Description
This work involves disconnecting existing water meters from the service water lines located at the rear or side of the properties and connecting new water service lines of the residences to the existing water meter at the front of the property, as shown on the attached sketch in the appendices. The Contractor shall be solely responsible for obtaining, executing, and securing all required signatures for the Owners Agreement. All labor coordination, administrative effort, and any other cost associated with this requirement shall be included in the Contract Price. The Contractor shall meet with the property owners/tenants at the site where the conversion will be performed, and the property owner shall have the opportunity to review the proposed route and provide input. The contractor shall also be responsible for obtaining the owner's signature for all required permits and for preparing, submitting, and securing all necessary permits, including plumbing and electric permits, from the applicable municipal Building Department where the work is to be performed. The Contractor shall furnish all materials, labor, and equipment as specified or necessary for a complete Project including but not limited to trench excavation, placing a sand/fine gravel bed on the bottom of the trench for pipe bedding, furnishing and installing the new water service from the new water meter located in front of the property to the existing household potable water system connection point, which includes copper pipes, tubing, fittings, valves, PVC valve boxes, grounding system (where applicable) and the installation of the new vacuum breaker at each existing and new hose bibb; furnishing and installing backflow prevention devices where applicable, install all piping, fittings, valve box and accessories to connect irrigation meter/submeter where existing, performing pressure tests on the new water service pipe, flushing, disinfecting the new service line, disposing of super chlorinated water properly, backfilling and compacting the trench, cutting and plugging existing water service line(s) located inside of the property, removing and disposing of the existing water meter box, filling void (at the abandoned 1-inch wing style angle stop valve) with ready mix concrete to 2-inches above the existing and to be abandoned 1-inch wing style angle stop valve, placing top soil on top of concrete and laying sod as needed to cover area or the necessary material to match the existing condition at this location, performing final cleanup/restoration and landscaping of the disturbed areas to equal or better condition. The Work also includes the safety and protection of the homeowners property, coordinating and obtaining necessary inspections from the Building Office of the municipality in which the work is to be performed, proper disposal of removed materials and other appurtenant and miscellaneous related items, and completion of the work to ensure a finished project. The County has allocated certain funds for this project. Should the amounts bid exceed expected levels, the Department reserves the right to either reduce quantities and/or delete elements of the work while proceeding at the prices bid or reject bids and re-advertise at its sole option. It is the intent of the Department to obtain a complete, functional, and satisfactory installation under this Contract, and any items of labor, equipment, or materials which may reasonably be assumed as necessary to accomplish this end shall be supplied, whether or not they are specifically stated herein.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 829671 | Published 6/19/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208