Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#823074 Posted 5/8/2026

Convention Center - Cooling Tower Water Line Replacement (RE-BID), West Palm Beach, FL

Owner Reference
2022-040567.1-R2
Bid Date
Jun 11, 2026 at 02:00pm
Pre-Bid
MANDATORY - 5/12/2026 @ 09:00am @ (for location please or )
Owner
County of Palm Beach
DBE Goal
SBE 10%
Trades
CA - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
Phase
Renovation, Remodel, Improvements, Upgrades

Description

To replace existing 8 and 10 cooling tower and bridge bypass water piping per the project requirements provided below: a. Contractor to phase construction in accordance with Engineers drawings and specifications. See Exhibit 1, where on sheet M-100, notes #13 & #14, there is a primary bid (Base Bid), a secondary piping bid (Add. Alt. Bid #1) for Aquatherm Blue pipe, and a third piping bid (Add. Alt. Bid #2) for NUPI piping or PBC approved equal. b. Only two cooling towers (North pair or South pair) may be out of service during any given time with stagger sequence to allow continuous air conditioning & chill water. c. Contractors Phasing Plan is to be submitted for review and approval by Convention Center, Project Manager and Engineer prior to implementation. d. Provide roof protection. e. Drain existing cooling tower and piping prior to replacement of piping. f. Remove existing horizontal condenser water 8 & 10 black steel piping, install isolation valves and butterfly valves from four cooling towers to where they connect to the building. g. Provide crane to remove existing demo material from roof and set new pipes which shall be installed in phases to allow continuous cooling for buildings h. Dispose off-site or in contractors dumpster. i. Reuse the existing pipe stanchions. Replace with 8 &10 piping with new valves. See Exhibit 1. Leak test, and fill new installed pipes and equipment when phases are completed. j. Install new bridge bypass piping, & UV resistant pipe insulation or coatings.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 823074 | Published 5/8/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208