Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#825116 Posted 5/20/2026

Eganfuskee Street Water Main Improvements (W2515), Jupiter, FL

Owner Reference
ITB-W2515-0-2026/SFM
Bid Date
Jun 16, 2026 at 02:00pm
Pre-Bid
Recommended - 5/28/2026 @ 02:00pm @ (for location please or )
Owner
Town of Jupiter, FL
Trades
CU - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, CU - Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Furnish all labor, equipment and materials necessary to improve the water distribution system along Eganfuskee St, Waldemar Rd. and Body Ct. in accordance with the Contract Documents. The work includes, but is not limited to: tying-in to an existing 6 PVC water main at the intersection of Eganfuskee St. and Paulina Rd. and install via open cut 665 LF of 6 and 4 PVC C-900 east down Eganfuskee St, north on Waldemar Rd. then east down Body Ct.; two 6 and one 4 MJ isolation Gate Valves; two fire hydrant assemblies, and 720 lbs. of ductile iron fittings; providing thrust restraint as noted in the contract documents; installation of one 1 Same Side Single Water Service, three 1 Road Crossing Single Water Services, one 2 Same Side Double Water Service, one 2 Road Crossing Single Water service, two 2 Road Crossing Double Water Services, and two Bacteriological Sample Points; disconnecting 11 existing water services and connecting to new water services; removal and disposal of 20 LF of Asbestos Cement Pipe; and cutting, capping, grouting & abandoning in place 620 LF of 4 & 6 Asbestos Cement water main pipe. Repair and restoration includes removal and replacement of 35 SY of driveways, 405 LF of Roadway Curb; making 350 LF of Roadway Edge Repair; and milling & resurfacing 2,000 SY of 1 of SP-9.5 asphalt in Town of Jupiter Rights-of-Way; restore landscaping, irrigation, sod and other existing improvements. Also included in the work is notification to affected property owners, temporary traffic control, coordination with Town staff to isolate portions of the distribution system, backfill, compaction, inspection, disinfection, testing, same day restoration to restore the residents water service and property access, restoration and all other water distribution improvements described by the Bid Documents to like or better conditions. It is the intent of this work to provide all necessary components and appurtenances described by the Bid Documents that are required to provide a complete and operational Town of Jupiter water distribution system.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 825116 | Published 5/20/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208