South Region Operations Center (SROC) - Paint Entire Complex, West Palm Beach, FL
- Owner Reference
- IFB-410-P-2026-000067-2
- Bid Date
- Jul 9, 2026 at 02:00pm
- Questions Due By
- 07/02/26
- Pre-Bid
- MANDATORY - 6/18/2026 @ 10:00am @ (for location please or )
- Owner
- County of Palm Beach, FL
- DBE Goal
- sbe 10%
- Trades
- Painting Contractor: Exterior/Interior Finish, Decorating; Interior Wallpaper & Wall Coverings, Waterproof & Weatherproof Services
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 210 days
Description
SCOPE OF WORK: This Quote/Bid is to furnish all material, labor, supervision, permits and supplies necessary and reasonably incidental to prep, prime, and paint the entire complex at SROC per the project requirements provided by Capital Improvements Division in this Invitation for Quote/Bid at Attachment C and all exhibits and addenda thereto. Work is to be done under the terms and conditions of Palm Beach Countys Annual Contract - Painting & Weatherproofing, and pursuant to the conditions of the Work Order, both of which are incorporated into the Contract Documents by reference. To prep, prime, and paint the entire complex at South Region Operations Center (SROC) per the project requirements provided below and the architectural drawings and specifications included as Exhibits 1: a. The contractor shall prepare, prime, and paint all wall surfaces of buildings K, L, N, O, P, Page 2 of 4 Q, R, M, T, W, including 2 sides of all exterior doors and frames, exterior of all rollup doors, the chiller enclosure, front monument sign, bollards, fire backflow piping, knee walls, area containment walls, light poles, and all previously painted surfaces connected to or in direct relation to these areas according to the specifications provided by Tnemec Coatings Inc. attached as Exhibit 1. b. The color scheme consists of multiple colors, Mississippi Mud, Cedar Key, Indian Gray, Safety Yellow, and Safety Red. c. Mississippi Mud shall be used on all roll up and exterior doors, frames, and roof drip edge. d. Cedar Key shall be used on all field or body surfaces and containment walls. e. Indian Gray shall be used for all banding and columns. Exact locations to be determined by Water Utilities Department (WUD) after award. f. This work includes pressure cleaning: the concrete slabs and walkways directly adjoining the buildings, containment walls, pedestrian doors, shutters, louvers, roll up doors, windows, bollards, fire sprinkler back flows, light poles, and front entrance monument. g. Unpainted aluminum or stainless-steel fixtures or attachments, anodized window frames shutters, standing seam roofing panels, gutters and downspouts shall be cleaned but left unpainted. Cleaning shall be performed by proper means that does not damage surfaces. h. Existing painted surfaces shall receive paint as determined by WUD. i. Prep will also include removing existing deteriorated caulking and replacing it with new urethane caulking tooled to a smooth uniform consistent surface, repairing and patching all holes and cracks to ensure complete weather tight integrity of the surfaces being painted. j. All repairs shall match the existing surfaces finish when completed. Building Signage will be removed and replaced like in kind (Size and Type) and colors to be chosen by WUD. k. Contractor shall protect all building elements with masking tape, plastic wrap cover to prevent paint splatter, spray, and overspray damage. Vehicles, landscaping, and exterior equipment located within the work area shall be protected or temporarily relocated as necessary to prevent damage.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
Plans & Specifications
or to view plans and specification details.
CBS ID: 826498 | Published 5/29/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208