Philippe Park Wastewater Collection System Improvements (Rebid), Clearwater, FL
- Owner Reference
- 26-0275-ITB-C
- Bid Date
- May 21, 2026 at 03:00pm
- Pre-Bid
- MANDATORY - 4/28/2026 @ 09:00am @ (for location please or )
- Owner
- County of Pinellas
- Trades
- Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- New Construction, Addition, Expansion
Description
Work in this project includes the installation of a new wastewater collection system consisting of approximately 2,800 linear feet of force main and four wastewater pumping stations in Philippe Park that will replace four onsite septic collection systems. The new system will connect to the City of Safety Harbor's wastewater collection system through the existing Lift Station No. 614. In addition, approximately 50 linear feet of the Lift Station No. 614 force main will be replaced at both the Lift Station and the discharge manhole.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 820338 | Published 4/22/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208