NEWRF Filter Station - Partial Filter Media Replacement, St. Petersburg, FL
- Owner Reference
- IFB- 26 - 258
- Bid Date
- Jun 16, 2026 at 03:00pm
- Questions Due By
- June 2, 2026, 5:00pm
- Pre-Bid
- Recommended - 5/27/2026 @ 11:00am @ (for location please or )
- Owner
- City of St. Petersburg, FL
- Trades
- Industrial Cleaning & Sanitation Preparations; Disinfection Services, Filter Building, Ultraviolet (UV) Disinfection System
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The City of St. Petersburg is seeking bids from a qualified vendor to perform four (4) partial filter media replacements at the Northeast Water Reclamation Facility (NEWRF), located at 1160 62nd Avenue NE. The project consists of removing, disposing, and replacing the top layers of filter media within the existing four (4) filter beds, including approximately 30 inches of anthracite coal, 10 inches of filter sand, and 2 inches of x gravel per filter bed. All existing lower gravel and underdrain tile systems shall remain in place and protected throughout the work.
This project is an interim rehabilitation effort to restore the performance of the existing filter station until a new parallel filter facility is constructed in the coming years. The work for this project will include removal, proper handling, disposal, and replacement of filter media in accordance with American Water Works Association (AWWA) B100 and MBM-S-100 specifications. The vendor will be responsible for furnishing all labor, equipment, materials, and supervision necessary to complete the project, for all four existing filter beds, in a manner that maintains the integrity of the existing structure and minimizes operational disruption.
The City has intentionally not included cubic yard quantities in the solicitation. The dimensions and depths of the filter cells vary, and bidders are expected to determine quantities based on the as-built drawings and specified media layer thicknesses. To ensure accurate estimating, the City has provided the as-built filter drawings as part of the bid documents under Attachments. The vendor shall calculate the volume of each filter media layer based on the dimensions and the replacement depths provided in the Scope of Work. The inch measurements in the Scope represent the finished depth of the media layers to be installed, consistent with AWWA B100 and the project specification MBM-S-100, and are industry standard for defining filter media placement thickness.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825351 | Published 5/21/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208