#823926 Posted 5/13/2026

Water Main Replacement Program Phase 8B, Venice, FL

Owner Reference
ITB-3188-26-0-2026/PB
Bid Date
Jun 23, 2026 at 02:00pm
Pre-Bid
Recommended - 6/4/2026 @ 10:00am @ (for location please or )
Estimate
$3,590,000.00
Owner
City of Venice, FL
Trades
CU - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The work of this Contract consists of water main replacements, new water main construction, gravity sewer replacements, roadway milling, overlaying and re-striping and miscellaneous sidewalk and driveway replacements on the Tarpon Center Drive peninsula including, but not limited to: 1.Extending the existing 12-inch PVC water main on Tarpon Center Drive ~1,550 LF from Higel Park to Inlet Circle. 2.Extending ~750 LF of 8 water main along Tarpon Center Drive from the end of the new12 water main at Inlet Circle to a new hydrant approximately 400 LF east of the South JettyBeach concession stand. 3.Relocating Jetty Villas Condominiums two (2) 2 potable water master meters to the TarponCenter Drive right-of-way. 4.Relocating the existing 3 potable water master meter at 1400 Tarpon Center Drive. 5.Abandoning the existing parallel 6-inch asbestos cement water mains along Tarpon Center Drive and connecting all services to the existing and new 12-inch water mains. 6.Replacing the existing asbestos cement water mains along Gibbs Road with ~800 LF of new8 and 4 water main. 7.Replacing the existing asbestos cement water mains on Inlet Circle with ~1,750 LF of new8 and 6 water main. 8.Approximately 52 new service lines from the new water mains on Gibbs Road and Inlet Circle to existing meters. 9.Replacement of ~642 LF of failing gravity sewer and 6 manholes along Tarpon Center Drive. 10.Abandonment of existing water main, force main, and gravity sewer mains as shown on theDrawings. 11.Removal of the concrete median and milling and overlaying Tarpon Center Drive. 12.Restriping Tarpon Center Drive to provide buffered bike lanes between approximately and Inlet Circle and shared lane markings (sharrows) from Inlet Circle to South Jetty Beach. 13. Replacing driveway aprons and upgrading existing pedestrian facilities in the right-of-way, where feasible, to meet Americans with Disabilities Act (ADA) requirements.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 823926 | Published 5/13/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208