Kentmere Lift Station Modifications and Force Main Design, Cumming, GA
The Forsyth County Board of Commissioners is soliciting bids from qualified firms to provide Construction services for the Forsyth County Kentmere Lift Station Modifications and Force Main Design including the following major components: 1. Modifications to the existing Kentmere Lift Station pump control logic and wetwell control elevations, including the installation of two wetwell float switches. 2. Installation of two (2) new flow meter vaults with associated two (2) new magnetic flow meters (6- inch and 8-inch), one 6-inch and one 8-inch actuated plug valves, new yard piping and valves, and associated controls. 3. Approximately 20 linear feet of 8-inch ceramic epoxy lined ductile iron pipe (DIP) at the lift station site, 2,130 linear feet of 6-inch ceramic epoxy lined DIP force main and 265 linear feet of 8-inch polyvinyl chloride (PVC) gravity sewer pipe with associated manholes, valves, and appurtenances.