Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#829132 Posted 6/16/2026

Northwest Corridor Segment 2A – Construction, Atlanta, GA

Owner Reference
DC-2026-105
Bid Date
Jul 22, 2026 at 01:00pm
Questions Due By
July 1st, 2026, by 3:00 PM (EDT)
Pre-Bid
MANDATORY - 6/25/2026 @ 10:30am @ (for location please or )
Owner
Atlanta Beltline, GA
DBE Goal
30%
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Road Improvements: Parking & Highway Improvements; Intersections, Roundabout, Median Construction - NAICS 237310, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Sand Bags, Stone Masonry Contractor: Block Wall, Chimneys, Retaining Walls, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Security System: FOB, Access Control, CCTV, Video Surveillance, Active Threat, Intrusion Alarms (Except Locksmiths) NAICS 561621, Standard & High-Risk Safety Systems: Vehicle Guides Barricades Barriers Guardrail Attenuators Crash Cushions Bollards
Phase
New Construction, Addition, Expansion

Description

Atlanta Beltline, Inc. (ABI) is soliciting competitive sealed bids from qualified firms to provide construction services for Northwest Trail Segment 2A starting from the west side Dellwood at the Bobby Jones Golf Course and will travel east down Colonial Homes Circle. The trail will then go south to meet Bennett Street. At Bennett Street the trail will turn east again and travel down the front of the Georgia Power sub-station. The segments ends at the northeast corner of the sub-station. The scope of work includes but is not limited to erosion control, grading, demolition, site retaining/decorative walls, storm drainage, utilities, concrete trail paving, pavers, lighting, security cameras, signage and marking, fencing/railings, site furniture/waste receptacles, and bollards.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 829132 | Published 6/16/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208