Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Idaho

#824501

FY25 D6 Rockfall Mitigation , Salmon, ID

Description: Removal of large rock outcrop, scale loose rock on cut slope and install mesh on US-93 at MP 319.679 to 319.725

Post Date: 05/18/2026 Bid Date: 06/09/2026 Trades: PWC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Rock Slope Construction Mitigation & Stabilization
#824504

Sugar City to 200 North, Sugar City, ID

Description: Placing concrete expansion relief joints on both EB and WB lanes of US-20 mainline followed by a 0.15' HMA Super pave overlay that includes the interchange ramps, MP 337.73 to MP 341.50 in Madison & Fremont Counties.

Post Date: 05/18/2026 Bid Date: 06/10/2026 Trades: PWC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#825211

RFQ SNRA Window & Door Replacement Project, Ketchum & Stanley, ID

Total Small Business Set-Aside, 236220 - Commercial and Institutional Building Construction. This project will replace existing windows, exterior entry doors, sliding glass patio doors, and overhead garage doors on various housing units and a warehouse building.

Post Date: 05/21/2026 Bid Date: 06/12/2026 Trades: Glass & Glazing Contractor: Glass Tinting, Glass Door, Window Installations, Repairs & Replacements, Door Service Contractor: Including Bay Doors, Fire Doors, Gates, Activating Devices & Overhead/Garage Door Opener
#823208

Construct Snow Removal Equipment Building, Priest River Airport, Bonner Co, ID

Work associated with proposed improvements is generally described as follows: Base Bid: Schedule A - Snow Removal Equipment (SRE) Building Additive Alt: Schedule B Concrete Floor and Sewer Service Additive Alt: Schedule C - Paved Approach and Access Additive Alt: Schedule D - Water Service Improvements Snow Removal Equipment Building consists of all elements necessary to construct a pre-engineered metal building for storage of the airports snow removal equipment. Work generally consists of the construction of a Snow Removal Equipment Building (approximate gross size 2,025 sft) with associated utility extensions, and vehicle access to roadway. Work includes sitework to construct the new building to include: surveying, erosion control, excavation, embankment, base course, asphalt paving, stormwater modifications and improvements, utility work, topsoil, seeding and other miscellaneous items. Building items include permitting, foundation and floor concrete, wood or steel framing and erection of trusses, insulation, overhead and man doors, HVAC, roofing, and electrical.

Post Date: 05/09/2026 Bid Date: 06/15/2026 Trades: PWC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#824604

Re-Bid of Construct Snow Removal Equipment (SRE) Building Priest River Airport, Sandpoint, ID

Scope of Work: Schedule A - Snow Removal Equipment (SRE) Building Additive Alt: Schedule B Concrete Floor and Sewer Service Additive Alt: Schedule C - Paved Approach and Access Additive Alt: Schedule D - Water Service Improvements Snow Removal Equipment Building consists of all elements necessary to construct a pre-engineered metal building for storage of the airport's snow removal equipment. Work generally consists of the construction of a Snow Removal Equipment Building (approximate gross size 2,025 square feet) with associated utility extensions, and vehicle access to roadway. Work includes sitework to construct the new building to include: surveying, erosion control, excavation, embankment, base course, asphalt paving, stormwater modifications and improvements, utility work, topsoil, seeding and other miscellaneous items. Building items include permitting, foundation and floor concrete, wood or steel framing and erection of trusses, insulation, overhead and man doors, HVAC, roofing, and electrical.

Post Date: 05/18/2026 Bid Date: 06/15/2026 Trades: PWC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, PWC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#824606

Wildfire Analysis and Assessment, Pocatello, ID

Scope of Work: Consultant shall conduct a wildfire vulnerability assessment and analysis, prioritized mitigation assessment, and prioritization and mitigation plan.

Post Date: 05/18/2026 Bid Date: 06/15/2026 Trades: Environmental Consulting & Testing, Water & Air Quality & Ecological Stewardship, Compliance & Services
#827453

Asbestos Removal Bldg. 67, Boise, ID

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, 562910 - Remediation Services. The Boise VA Medical Center is seeking a vendor to remove approximately 475 square feet of asbestos containing black mastic, under non-asbestos floor tile, in our former medical records room. The chosen contractor must be capable of providing personnel, supervision, equipment, supplies, certifications, transportation, waste disposal, and other resources necessary for asbestos abatement in compliance with all applicable local, state, and federal laws. The Contractor shall remove approximately 475 square feet of asbestos containing black mastic located under non-asbestos floor tile. The asbestos containing materials must be removed from the base concrete floor of Room G26 without causing noticeable damage. All flooring materials within the scope of work must be removed from the Boise VA Medical Center campus and disposed of in accordance with local, state, and federal laws.

Post Date: 06/04/2026 Bid Date: 06/15/2026 Trades: Asbestos (ASB), Lead, Arsenic Detection: HAZ Certification, Remediation, Toxic/Contaminants; Remedial Action Plan (RAP)
#827476

Ada County Courthouse Pump Replacement Project, Boise, ID

Project Scope: The work entails demolition, removal, and operational installation of several pump systems at the Ada County Courthouse (200 W Front Street, Boise, ID): Penthouse (6th Floor): Replacement of 4 existing pump units. [1] Sally Port Basement: Replacement of 2 existing sewer ejector pumps. Garage: Demolition and replacement of existing sump pumps, rail systems, and floats. HVAC Systems: Replacement of chilled water primary/secondary pumps, heating water primary/secondary circulating pumps, and associated VFDs. Supporting Work: Piping revisions, fittings, insulation removal/repair, electrical disconnect/reconnect, controls disconnect/reconnect, startup, and testing.

Post Date: 06/04/2026 Bid Date: 06/15/2026 Trades: PWC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's, Machinery and Pumps Contractor; Machinery Repair, Grapple Rebuilds, Motors & Variable Frequency Drives (VFD's)