2026 Zion Sidewalk Project Phase One, Zion, IL
- Bid Date
- Jun 2, 2026 at 10:00am
- Owner
- City of Zion, IL
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 45 calendar days
Description
The work is entitled "2026 Zion Sidewalk Project Phase One", City of Zion, Lake County, Illinois. The work shall include furnishing all labor, materials, equipment, tools, and services necessary to excavate and install the materials needed to complete the project as directed by the owner. The Contractor shall examine the conditions of the site and must assume the risk of encountering, quicksand, hardpan, boulders, clay, rubbish, and underground conduits.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825452 | Published 5/22/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208