The project entails the removal and replacement of specific fences, gates, and toppers at Sauk Valley Community College. The contractor will furnish all labor, materials, and equipment necessary to construct the proposed improvements as described in the specifications
Post Date: 05/06/2026Bid Date:05/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, Tide Gates
Pricing shall include all costs for the site preparation, materials, installation, and delivery to Sauk Valley Community College in Dixon, IL. No additional fees, fuel surcharges, or unloading fees shall be paid by the College. o Deliveries must be coordinated with the Athletics Department. Materials must be dumped in a designated area as directed by College staff. o All 650 tons must be delivered and on-site no later than July 31, 2026. o This project is subject to the standard BEP utilization goal. Bidders must include certified diverse vendors or submit a waiver request with their utilization plan. SURE-HOP INFIELD MIX SPECIFICATIONS: Amount: o 650 Tons. Brand Requirement: o Classic SureHop Infield Mix. Gradation o 3/16 Minus Screening. Material must be 100% free of large stones and organic debris. Composition o Professional blend of approximately 70-80% sand and 20-30% silt/clay specifically designed for collegiate-level infield playability, providing high-density compaction while remaining loose enough on the surface for sliding and ball hop consistency. Color: o Natural Tan/Gold.
Post Date: 05/06/2026Bid Date:05/12/2026Trades: Suppliers: Supplies/Rental/Delivery of Construction Related, Construction Dependent or Construction Equipment, Sand and Gravel NIGP 750-77
The project involves field improvements at Sauk Valley Community College, including demolition, debris removal, and precision regrading of the baseball and softball fields. The contractor will furnish all labor and equipment necessary to complete the proposed improvements as described in the specifications. The contractor shall coordinate all work with other contractors, manufacturers, and material suppliers contracted with the owner as part of this project.
The Illinois Dept. of Human Services is seeking a vendor to remove and replace existing sidewalks at the Mabley Developmental Center located at 1120 Washington Ave., Dixon Il 61021
Post Date: 05/19/2026Bid Date:06/02/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling