Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all McHenry County, IL

#824551

Wellhouse Epoxy Floor Installation, Lake in the Hills, IL

Wellhouse Epoxy Floor Installation 9006 Haligus Road, Lake in the Hills, IL 60156

Post Date: 05/18/2026 Bid Date: 05/26/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl
#826139

Ackman Road Improvement Project, Woodstock, IL

The scope of this project is Ackman Road from Lakewood Road to Golf Course Road. The project will fill in the gaps of bicycle and pedestrian infrastructure along this section of the corridor and address the turning conflicts and capacity concerns at the intersections of Lakewood Road, Red Tail Drive, Swanson Road, and Huntley Road. Golf Course Road improvements beyond pedestrian and bicycle improvements will be omitted from this project. The Village of Lake in the Hills, the Village of Lakewood and the City of Crystal Lake are within the limits of the project.

Post Date: 05/26/2026 Bid Date: 06/02/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#826140

Pyott Road and Oak Street Safety Improvement, Woodstock, IL

The scope of this project will look at Pyott Road from Imhoff Drive to Willow Street in the Village of Lake in the Hills and all intersections in between, including Industrial Drive, Oak Street, and McPhee Drive. Pyott Road is a County Highway. All intersecting roads within this section of Pyott Road are under the jurisdiction of the Village of Lake in the Hills. This stretch of roadway is approximately 0.9 miles long. All intersections within this corridor are two-way stop-controlled intersections. All intersections are three-legged intersections except for Willow Street, which has four legs.

Post Date: 05/26/2026 Bid Date: 06/02/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Road Improvements: Parking & Highway Improvements; Intersections, Roundabout, Median Construction - NAICS 237310, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#826261

Demolition of Pole Barn & Restoration Project at Goose Lake 9400 IL Route 173 Hebron AND Demolition of Residence & Restoration Project at The Hollows Cary IL, Woodstock, IL

Demolition of Pole Barn & Restoration Project at Goose Lake 9400 IL Route 173 Hebron, IL 60034 AND Demolition of Residence & Restoration Project at The Hollows 3800 US Highway 14, Cary IL 60013

Post Date: 05/27/2026 Bid Date: 06/05/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#827658

Pavement Condition Assessment and Report, Crystal Lake, IL

The City of Crystal Lake, Illinois seeks a qualified consulting firm to complete a pavement condition analysis and generate a Pavement Condition Index (PCI) summary of all City-owned roads within the City of Crystal Lake. The City of Crystal Lake has approximately 170 centerline miles of roadway, and 320 lane miles.

Post Date: 06/05/2026 Bid Date: 06/10/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study