Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Williamson County, IL

#823524

Construction of New Sidewalks along Fair St. and Morning Side Dr., Marion, IL

The proposed project involves providing a safe route to school along Fair Street and Morningside Drive in the City of Marion. The work will include construction of new sidewalks, crosswalks, ADA ramps and associated improvement necessary to complete the new sidewalk along Fair Street from IL Rte. 13 to Morningside Drive and along Morningside Drive to near Reveille Road.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
#827149

Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13. , Springfield, IL

The project involves the reworking of the aggregate shoulder and slope embankment due to erosion issues causing slope failure. Stone dumped rip-rap, A3 will be utilized to rebuild the slope on the east side of the causeway over Crab Orchard Lake. Location: This improvement consists of slope stabilization along IL 148,1.54 miles S of Old IL 13. The improvement is approximately 0.71 miles long and crosses Crab Orchard Lake in Williamson County.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Sand Bags
#826562

Crab Orchard Greenway Trail - Section 3, Williamson County, IL

Horner & Shifrin, Inc., on behalf of the Crab Orchard National Wildlife Refuge and Williamson County, is pleased to invite qualified contractors to submit bids for the Crab Orchard Greenway Section 3 project. Approximately 1.894 miles of new 10 wide concrete multi-use trail will be constructed, including tree removal, earthwork, grading and drainage items.

Post Date: 05/29/2026 Bid Date: 06/16/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823031

SOURCES SOUGHT Lift Station and Grease Trap Services, Marion, IL

562998 - All Other Miscellaneous Waste Management Services. The services performed on the lift station shall either be general or confined space entry. General services does not require the contractor to physically enter the wet well, however the contractor shall be responsible for pumping out all liquid, oil, fuel, solids, grease, sand and miscellaneous debris from within the wet well, in addition to the removal of waste build up on the wet well walls.

Post Date: 05/07/2026 Bid Date: 05/15/2026 Trades: Solid Waste Collection & Waste Management (Non-HAZ): Garbage, Trash Disposal, Recycling, Compacters, Balers NAICS-562111
#824186

SOURCES SOUGHT Emergency Repair Tornado Damage FCI Marion, Marion, IL

237130 - Power and Communication Line and Related Structures Construction. To provide all necessary equipment, labor, materials, and incidentals to repair damage to the 3-phase overhead primary distribution line and two (2) transformers.

Post Date: 05/15/2026 Bid Date: 05/27/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors