Cousins Boulevard Extension (Woodmere Blvd. to Lapalco Blvd.), Jefferson, LA
- Owner Reference
- 50-00150075
- Bid Date
- Jun 25, 2026 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 6/9/2026 @ 10:00am @ (for location please or )
- Owner
- Parish of Jefferson, LA
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The project consists of Grading, Base Course, Drainage Structures, Asphalt Concrete, Portland Cement Concrete, Concrete Curb, Bridge Construction, Street Lighting, Earth Work, Canal Work, and Traffic Signalization.)
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 830060 | Published 6/23/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208