FY2026 Water Main Replacements Project, Belmont, MA
- Owner Reference
- DPW-Water01
- Bid Date
- Jun 4, 2026 at 11:00am
- Owner
- Town of Belmont, MA
- DBE Goal
- MBE: 5% or WBE: 5%
- Trades
- Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- New Construction, Addition, Expansion
- Duration
- 120 calendar days
Description
The scope of work includes the construction of approximately 2,200 linear feet of new 8-inch and 10-inch ductile iron water main, transfer and installation of water services, installation of fire hydrants, abandonment of existing water main, and all other appurtenant work in Elm Street and Chandler Street. The scope also includes water main tie-in connections and water service transfers to accommodate the abandonment of the 6-inch cast iron water main in Lexington Street; the existing 10 water main will remain in service.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
Plans & Specifications
or to view plans and specification details.
CBS ID: 824734 | Published 5/19/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208