Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#824692 Posted 5/19/2026

Jackson and Public Works Sewer Lift Stations Pump & Controls In-Kind Replacement Project, Franklin, MA

Bid Date
May 29, 2026 at 10:00am
Pre-Bid
Scheduled, Optional - 5/7/2026 @ 11:00am @ (for location please or )
Owner
Town of Franklin, MA
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
New Construction, Addition, Expansion

Description

The work to be done under this Contract for the base bid at the Public Works Sewer Lift Station consists of the following: The removal of the existing Gorman Rupp T3A3S-B pumps, motors and drives and Pump Control Panel, check valves, air release valves, and pressure gauges (4) along with the associated tubing. The existing belt guards and pulleys will remain. Furnish and installation of in-kind replacements for the existing pumps, motors, drives and control panel. Include furnish and installation of new belts and sheaves to achieve the required pump speed capable of producing 175 GPM at 65 FT TDH with a 10H.P. 3-phase Motor. Utilize all existing suction and discharge piping. Furnish and installation of in-kind replacements for the existing check valves, air release valves and pressure gauges (4) along with associated tubing. The new control panel is to be a NEMA 3R steel enclosure, wall mounted panel, with internal transformer, Pump controller, contactors and overloads, transducer inputs (including furnish and install of transducer), 2 floats for emergency high and low level backup (including furnish and installation of floats) dry contacts for SCADA connection he Town will provide by-pass pumping over the course of a 24 hour period to facilitate installation. If the contractor needs additional time they are responsible for temporary by-pass pumping. Connection of all new control panels and devices into the existing electrical and instrumentation systems (signals include pump run, pump fault, high and low wet well level). Electrical work includes running a permanent conduit and power to the existing SCADA Panel. All other work as required and as indicated in the contract documents. See attached for alternate work. Addendum No 4 moved the bid due date to May 29th.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 824692 | Published 5/19/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208