Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#827183 Posted 6/2/2026

Boston City Hall HVAC Upgrades, Phase II, Boston, MA

Owner Reference
Project No. 7032A
Bid Date
Jun 23, 2026 at 12:00pm
Questions Due By
June 12, 2026 at 12:00 PM
Estimate
$68,750,000.00
Owner
City of Boston, MA
Trades
*General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The City of Boston acting by its Public Facilities Commission, through its Director of the Public Facilities Department (PFD) solicits statements of qualifications (SOQ) to prequalify subcontractors and general contractors for this project with a construction estimate of $68,750,000. In general, work involves: Replacement of air handlers at Boston City Hall. Associated mechanical, electrical, plumbing, fire protection, painting, masonry, miscellaneous and ornamental iron work. Roof replacement. Renovation of mechanical spaces and shop area. This Request for Qualifications (RFQ) is the first part of a two-step process. Based on the SOQsreceived in this Phase I. The Awarding Authority will select respondents it deems to be prequalified in accordance with the criteria set forth in the RFQ. Only contractors prequalified for this project in Phase I will be permitted to submit bids in Phase II.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 827183 | Published 6/2/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208