Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#828406 Posted 6/10/2026

5103-5105 Eugene - Abatement and Demolition Services, Dearborn, MI

Owner Reference
ITB-000907
Bid Date
Jul 1, 2026 at 03:00pm
Questions Due By
6/22/2026 @ 12:00pm
Pre-Bid
MANDATORY - 6/17/2026 @ 10:00am @ (for location please or )
Owner
City of Dearborn, MI
Trades
Asbestos (ASB), Lead, Arsenic Detection: HAZ Certification, Remediation, Toxic/Contaminants; Remedial Action Plan (RAP), Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
Phase
Demolition, Hauling
Duration
45 calendar days

Description

Vehicular and pedestrian traffic (on sidewalks) must not be impeded. f) Remove all asbestos per Federal and State guidelines and obtain necessary asbestos clearances. The complete removal of all walls, roofing, posts, masonry and any other above grade structures are to be completely removed from the demolition site, unless specifically permitted otherwise in writing as part of the demolition permit. All signage & support, and wiring is to be completely removed. i) CONCRETE: i) Contractor is to remove all at-grade or below grade concrete including: (1) Floors (2) Footings (3) Foundations (4) Concrete work ii) Contractor IS NOT to install new concrete curb and gutter iii) Contractor is responsible for all damages to existing sidewalk, curb and gutter, etc. (1) Remove and replace sidewalk that may be damaged during construction. Sidewalk shall have a minimum depth of 4. (2) Use 3500 PSI concrete mix for concrete pavement, curb & gutter and sidewalk. j) SEWER: Cap sewer opening at property line. k) Remove all small trees (less than 12 inch diameter trunk) and bushes from property l) Removal and disposal of demolished and/or disassembled materials. This includes all debris on the site even though it is not part of the structures or their contents. m) Contractor shall not remove existing soil unless otherwise directed. n) Complete restoration or replacement of damaged private and public property. o) Backfill the area and all areas below grade. Before backfilling, ensure that areas to be filled are free of standing water, materials, organic matter, trash and debris. p) Backfill must obtain 95% compaction on deep footing holes with clean fill with a minimum of 4 of topsoil. q) On any areas that are left with bare ground: reseed with 5lbs per 1,000 sq. ft. with a mix of 48% Rye, 30% Greenburg Red and 22% Kentucky Blue Grass hand thrown and protected with straw covering.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 828406 | Published 6/10/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208