District Wide Culvert Lining and Joint Repair, St. Paul, MN
District Wide Culvert Lining and Joint Repair. Location: In Aitkin, Carlton, Itasca, and St. Louis Counties on District 1 Various Trunk Highways
Need an account?
Remembered your password?
Already have an account?
District Wide Culvert Lining and Joint Repair. Location: In Aitkin, Carlton, Itasca, and St. Louis Counties on District 1 Various Trunk Highways
Grading, Bituminous Milling and Surfacing, ADA Improvements, and Revise Signal System. Location: In Dakota County on Sibley Memorial HWY from S Junction with TH 13 to N Junction with TH 13
Total Small Business Set-Aside, 237310 - Highway, Street, and Bridge Construction. Work consists of enhancing pedestrian access over Grand Portage Creek via the historic Mile Creek Stone Bridge to a newly defined parking area at the intersection of Pines Road and the abandoned Mile Creek Road, adjacent to the Pines Picnic area, as well as improving vehicular safety by removing the abandoned roadway pavement at the intersection of Pines Road and the newly realigned Mile Creek Road.
Grading, Concrete & Bituminous Surfacing, Roundabout, Lighting, and ADA Improvements, County of Wright MN - Location: 0.406 miles (TH 24), 0.334 miles (CSAH 7)
The work of this project includes the rehabilitation and cleaning of a 36-in gravity interceptor and 23 manholes, temporary erosion control, traffic control, dewatering and restoration, along with temporary conveyance of wastewater in a phased manner.
237110 - Water and Sewer Line and Related Structures Construction. Dewatering Performance: Design, furnish, install, test, operate, monitor, and maintain dewatering system of sufficient scope, size, and capacity to control hydrostatic pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades.
Environmental Assessment and Abatement, Master Contract 25P267, which includes the following services: environmental assessment, testing, isolation, removal, and disposal of asbestos containing materials and/or suspected other hazardous materials at any Metropolitan Council Water Resource Recovery Facility (WRRF) or lift stations, existing or future site, or other site within the region served by Council.
Requested services include, but are not limited to, predesign and design services, provision of construction documents, and construction administrative services.
This project seeks to restore many of the failing window glazing units at the Judicial Center (JDC) in Hastings, MN. Beyond replacing insulated glazing units, the project also includes cleaning windows, recaulking of glass to existing frames and caulking of existing frame interiors. There are two alternates that add restoration work at select window areas, which can otherwise be deferred if needed to meet the budget.
High Profile Courtrooms Remodel, 2100 3rd Avenue, Anoka MN
The Contractor will provide all material and labor to complete the roof replacement according to plans & specs.
238220 - Plumbing, Heating, and Air-Conditioning Contractors. Provide inspection, maintenance, repair, and training for cooling towers. PoP 06-01-2026 - 06-30-2027
561720 - Janitorial Services. The Contractor shall maintain all designated lawn areas within the Deer River Ranger District office compound (located at approximately 1235 Division Street, Deer River, MN) to ensure a neat, professional appearance. Services include routine mowing, trimming, edging (as needed), and seasonal clean-ups. Pop 05/15/2026 to 10/31/2030.
Total Small Business Set-Aside, 237310 - Highway, Street, and Bridge Construction. The USFS is pursuing a Purchase Order to provide road repair construction services on the Woodtick Trail in the Walker Ranger District, Chippewa National Forest. Activities include but are not limited to roadway reconditioning, spot graveling, culvert installation, beaver dam removal, and gravel resurfacing. PoP 06/01/2026 to 10/21/2026
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, 221310 - Water Supply and Irrigation Systems. The Contractor shall design and provide a complete service-oriented water treatment program for all boiler systems, cooling towers, all heating water circulating systems, and all chilled water systems.
The Contractor will provide all material and labor to complete the roof replacement work.
The Metropolitan Council (Council) is soliciting Prequalification Submittal Documents (PSDs) for the purpose of establishing a list of prequalified SPECIALTY CONTRACTORs to provide the specialty construction associated with compaction grouting beneath the existing interceptor, instrument monitoring during the grouting application, liner removal, rehabilitation of existing sanitary interceptor, installation of a new M228A metering structure and incidental restoration work.
The proposed work consists of constructing an approximately 750-foot pocket track to support LRT operations, extending from approximately Station 102+53.5 to 109+65. The scope includes installation of one No. 6 RH turnout (approximately 69 track feet), placement of concrete ties (including standard, restraining rail, and guard rail ties as required), installation of new rail, and secure fastening of rail to ties via insulated shoulders in accordance with LRT standards. Work will also include placement of approximately 300 tons of mainline ballast, followed by lining and tamping to achieve final plan alignment, profile, and grade. Construction activities will encompass track layout, material handling, rail installation, surfacing, and final adjustment to ensure operational readiness and integration with existing track infrastructure. Available inventory of concrete ties will be utilized where feasible to reduce material procurement costs, with remaining materials supplied as required.
Pavement Rehabilitation and Bituminous Overlay for the County of Anoka, MN
Painting of Various Signal Systems in the Cities of Blaine, Lino Lakes, Centerville, Circle Pines and Lexington - Anoka County