Oakley Sidewalk Extension Project, Harrisburg, NC
- Bid Date
- Jun 4, 2026 at 11:00am
- Questions Due By
- 5/29/2026 @ 5:00pm
- Owner
- Town of Harrisburg, NC
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 12/4/2026 completion
Description
The Project consists of a public sidewalk extension along the north side of Oakley Drive to tie into existing sidewalk on Harris Depot Road. The scope includes installation of approximately 1300 feet of new 5 wide concrete sidewalk, curb ramps, storm, grading, traffic control, mobilization, erosion control and all other work necessary to complete the project as shown in the plans in accordance with state and local standards and regulations.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 826433 | Published 5/28/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208