Design/Build Services for Wastewater Treatment Plant Project, Canton, NC
The proposed Town of Canton Wastewater Treatment Plant will have a treatment capacity of approximately 4 million gallons per day. The design and construction shall ensure that expandability of the facility is possible. This project will entail design, permitting, and construction of the new facility, along with a new pump station and force main to convey wastewater to the new facility. A new effluent discharge to the Pigeon River will be required. The selected Offeror (Design-Builder) will form a team with the Town and its Owners Advisor and execute preliminary and final comprehensive agreements for design and construction at a total project cost within the approved budget amount. The Design-Builder may also: Provide survey and subsurface utility engineering services. Assist with easement acquisition for the new pump station and force main. Provide geotechnical investigations in addition to information that will be made available to the selected team, previously collected by others.