Trent River Boring Construction Project, New Bern, NC
The scope of contracted services should include the following: Boring a. One (1) 20 OD HDPE pipe installed from the proposed entry/exit points b. c. d. HDPE Pipe (See Exhibit C) All setup and cleanup required at entry & exit point locations All expendable material, i.e., drilling fluid, lubricant, etc. The scope of boring construction should NOT include the following: Boring a. Entry/Exit location Quazite boxes (provided by the City of New Bern utility)