2026 Emergency Restoration Storm Rates, Buxton, NC
- Owner Reference
- 26-2
- Bid Date
- Jun 1, 2026 at 05:00pm
- Questions Due By
- 5/26/2026 @ 5:00pm
- Owner
- Cape Hatteras Electric Cooperative (CHEC), NC
- Trades
- High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Contracted Services & Suppliers
Description
CHEC has identified the need for additional equipment and manpower in the event of storm damage. The goal of this contract is to provide CHEC during 2026 with equipment and qualified manpower to restore power after a storm. The work will be typical for that as a result of hurricanes, storm surges, and tornadoes. The contractor shall provide all labor and equipment necessary to complete this service. The work is post-storm emergency restoration of power which includes overhead line construction for both transmission and distribution lines. Rates should be provided for employees and equipment.
Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825517 | Published 5/22/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208