Water Distribution System Improvement Project, Winston-Salem, NC
The Scope of Work to be performed under these Contract Documents is generally described as follows: Installation of approximately 60 LF of 4-inch waterline, 650 LF of 6-inch waterline. and 5,640 LF of 8-inch waterline in residential neighborhoods and downtown corridors including two segments installed by bore and jack methods. Installation of approximately 3,530 LF of 12-inch waterline along a rural highway including one segment installed by bore and jack methods. Installation of 13 owner-provided Sampling Stations and 6 owner-provided Automatic Flushing Devices. Removal of a valve vault and reconfiguration of waterline piping. Traffic control, site restoration, and related work.