Waste Water Treatment Plant Improvement Project - Phase 7 (Federal Funding), Enfield, NC
The project scope of work for Phase-7 WWTP project consist of the furnishing of all materials, labor and equipment necessary to install the following: Replacement of the existing sewage sludge and scum pumps, replacement of a 5 hp and 15 hp floating aerators and a 15 hp floating mixer, equipment electrical control panels, the rehabilitation of an existing 46 ft. clarifier equipment, removal of sludge, sand and debris from sludge holding tanks, replace 10 ft by 12 ft wood building, 60 lf of concrete sidewalk replacement, install 2-inch site water line and yard hydrants.