Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Montgomery County, NC

#826315

Stanback Park Drainage Improvement Project, Mount Gilead, NC

The Project includes the removal of approximately 750 L.F. of concrete channel in the Town of Mount Gilead, NC to facilitate a stream restoration in Stanback Park. The stream restoration will increase sinuosity and reduce the overall slope of the channel while improving the environment. The project also includes the replacement of an outdated pedestrian bridge at the park.

Post Date: 05/27/2026 Bid Date: 06/18/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
#823652

Professional Engineering Services for Water Line Infrastructure Project (State Funding), Mount Gilead, NC

Engineering services shall include, but are not limited to, standard tasks necessary for the implementation of the project in conformance with the CDBG-I program and NCDEQ compliance areas: 1. Preparing and approval of the engineering report prior to the Release of Funds a. Engineering Report must follow guidelines set by NCDEQ b. Engineering Report / Environmental Information Document | NCDEQ c. Engineering Reports anticipated deadline to be complete and submitted to NCDEQ is forty-five (45) days after agreement is fully executed. 2. Provide assistance to the Town of Mount Gilead and their grant administration consultant with preparation, review, and completion of the Environmental Information Documentation. Upon the receipt of Release of Funds of the construction grant, the following scope of work is required: 1. Preparing the final design and construction bid package in conformance with applicable regulations and requirements; 2. Ensuring compliance with Buy America, Build America (BABA), Davis-Bacon, and other Federal requirements; 3. Supervising the bid advertising, tabulation, and award process, including preparing the advertisements for bid solicitations, conducting pre-bid meeting, conducting bid opening, and issuing the notice to proceed; 4. Conducting the pre-construction conference; 5. Surveying, field staking, on-site supervising of construction work, and preparing inspection reports; 6. Reviewing and approving all contractor requests for payment, change orders, and submitting approved requests to the governing body; 7. Providing reproducible plan drawings to the Town upon project completion; 8. Conducting final inspection and testing; 9. Submitting certified as-built drawings to appropriate authorities; and 10. Preparing an operation and maintenance manual (if applicable).

Post Date: 05/12/2026 Bid Date: 06/05/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study