Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#827739 Posted 6/5/2026

Northside High 600 Hall and 600 Hall Addition Reroofing, Jacksonville, NC

Owner Reference
MA2023J
Bid Date
Jul 22, 2026 at 02:00pm
Pre-Bid
Urged - 6/16/2026 @ 10:00am @ (for location please or )
Owner
Onslow County School District, NC
Trades
Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Removal of existing EPDM single ply membrane, existing metal trim down to existing insulation and fiberboard (if any) and the recovering of roof with new 3/8" gypsum core boards with fiberglass facer mat (Dens Deck ProFast Prime Roof boards, or equivalent and a new 60 mil, reinforced, smooth white, fully adhered TPO membrane roofing system with 20 year NDL manufacturer's warranty. Contractor is responsible for the legal disposal of all debris. The existing insulation and roof deck shall remain in place. Where there are existing roof drains, they are to remain, provide new bolts in the clamping, compression rings. Where the clamping, compression rings are damaged or broken, provide new cast iron clamping, compression rings with new cast iron domes. Plastic domes and retrofit-type drains are unacceptable. All metal trim, (coping, counter flashings, termination bars shall be new.) If there is epdm run up wall behind metal trim, we want TPO run up the same way. If that is not possible contact owner with an alternative. Metal cap flashing shall be prepainted aluminum. Provide a one-piece cap flashing with continuous cleats each side at the top of exposed parapet walls. Provision needs to be made for expansion and contraction. Metal cap flashing shall be in 10 Foot lengths unless shorter pieces are required. Gravel stops, perimeter edge (coping), counter flashings facia shall be formed of prepainted aluminum, 10-foot minimum sections, extending on roof not less than 4". Existing scupper locations shall be reused for new scuppers. All scuppers shall be replaced by prepainted Kynar finish matching existing gutters and coping metals. The cost of all required inspections and permits (opening and closing of permits) shall be the responsibility of the contractor. Upon completion of roofing work, contractor will furnish to the owner The Roofing Systems Manufacturer's 20 year (or longer) Full Value NDL Full System Warranty on materials and of the Roofing System, roofing, insulation, flashing and sheet metal work, 10 year water tightness warranty and a 2 year Contractors workmanship warranty (guarantee) against leakage and defects due to workmanship and / or negligence by contractor. When inspection is called for, owner shall be informed and on site when inspected by representative of roofing manufacturer.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 827739 | Published 6/5/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208