Fire Training Equipment Storage Building - Site Work and Building Upfit Project, Wentworth, NC
Work generally consists of furnishing of labor, material, and equipment to conduct site improvements to address clearing and grading of building pad for 60 x 60 pre-engineered building. Construction of slab on grade concrete pad, setting anchor bolts and to coordinate with Cirrus Construction, Inc. for the erection of the pre-engineered building. The scope of work will also include interior upfit of the pre- engineered building to address installation of the mechanical ventilation system and unit heaters, placement of three overhead coiling doors, electrical power and overhead lighting. All work is to be per the project drawings and specifications.