Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#825358 Posted 5/21/2026

Prequalification for Ferry Technology Center Whole Building Backup Power, Raleigh, NC

Bid Date
Jun 15, 2026 at 05:00pm
Owner
North Carolina State University (NCSU), NC
Trades
High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, Generator Contractor: Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems
Phase
Prequalification

Description

The project scope includes required site work, generator screening wall, and installation of, one (1) 500 kw generator, new panelboard, ATS and MTS procured by NCSU, to provide full standby power at the Avent Ferry Technology Center.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 825358 | Published 5/21/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208