#825144

Midtown Spot Safety Improvements Project - Phase 1, Raleigh, NC

This project consists of bus stop improvements at seven (7) locations along Six Forks Road, between Rowan Street and Millbrook Road. The purpose is to enhance transit connectivity and improve rider accessibility along this high-traffic corridor. Major work includes construction of ADA-compliant landing pads at each location, along with associated grading and concrete work. The Contractor will be responsible for all landing pad installation and related site work. Bus shelters will be installed separately by GoRaleigh under a separate contract.

Post Date: 05/20/2026 Bid Date: 06/18/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#825181

Supplemental Resurfacing Project, Raleigh, NC

The Project consists generally of the following major items: Resurfacing of approximately 6.7 centerline miles of City streets, consisting of approximately 9,505 tons of Superpave Asphalt. Installation of approximately 125 sidewalk access ramps. Approximately 98,445 square yards of asphalt milling. Installation of approximately 10,500 tons of Intermediate and/or Base Course Asphalt for pavement patching. Furnishing and placement of thermoplastic pavement markings. Furnishing and installation of inductive detection signal loops. Removal and construction of approximately 12 speed humps. Earthwork, erosion control, and seeding and mulching as specified in the contract.

Post Date: 05/20/2026 Bid Date: 06/18/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#825185

Greenways Ramp Upgrades Project, Raleigh, NC

The Project consists generally of the following major items: The complete removal and disposal of existing sidewalk ramps as identified by the City of Raleigh and replacement with upgraded ADA-compliant access ramps within the City areas under its jurisdiction The removal and replacement of sidewalk panels, curb and gutter as identified by the City of Raleigh in accordance with project specifications Resetting permanent and hinged bollards in place as specified in the contract The restoration of all disturbed areas including backfilling, grading, seeding and mulching with NCDOT approved seed mixtures

Post Date: 05/20/2026 Bid Date: 06/18/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#826431

Wilbon Road Elevated Storage Tank and Upper Pressure Zone Development Project, Fuquay-Varina, NC

The Wilbon Road Elevated Storage Tank and Upper Pressure Zone Development includes but is not limited to the following: 1. Construction of 1.0 MG Elevated Storage Tank 2. Construction of Water Line Connection for EST 3. Construction of Four Pressure Reducing Valve Vaults 4. Construction of Water Line from Judd Parkway to the Wilbon Road Booster Pump Station

Post Date: 05/28/2026 Bid Date: 06/18/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Tank & Silo Construction & Controls, Maintenance, Inspections, Repair & Cleaning, Pressure Washing
#826359

Prequalification for Office of the Secretary of State Renovation Project, Raleigh, NC

Muter Construction/CT Wilson, a Joint-Venture Partnership, the CMAR for the Consolidation of NC DOA Office of the Secretary of State-Renovations, is seeking to pre-qualify subcontractors for the following bid packages: (BP01) General Trades; (BP02) Selective Demolition; (BP03) Cast-in-Place Concrete; (BP06) Architectural Wood Casework; (BP07) Sheet Waterproofing & Joint Sealants; (BP08A) Doors, Frames, Hardware Material + Installation; (BP08B) Glazing, Security Doors + Windows; (BP09A) Gypsum Board Assemblies; (BP09B) Acoustical Ceilings; (BP09C) Flooring; (BP09D) Painting; (BP10) Operable Partitions; (BP21) Fire Sprinkler; (BP23) HVAC; (BP26) Electrical; (BP31) Earthwork + Site Improvements.

Post Date: 05/27/2026 Bid Date: 06/19/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#826850

Tree Removal, Stump Grinding, & Tree Pruning, Raleigh & Wilmington National Cemeteries, Raleigh & Wilmington, NC

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, 561730 - Landscaping Services. The Contractor shall perform tree Removal, stump grinding, and tree pruning at Raleigh and Wilmington National Cemeteries in accordance with the Statement of Work.

Post Date: 06/01/2026 Bid Date: 06/22/2026 Trades: Tree Service Contractor: Planting/Trimming/Pruning Trees, Tree Felling, Stump Removal, Stump Grinding, Hydro-Ax Services
#827731

Bridge Repair and Preservation Project Rebid, Raleigh, NC

This project is for the repair and preservation of the various bridges within the city of Raleigh.

Post Date: 06/05/2026 Bid Date: 06/22/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction
#825672

Neuse River Resource Recovery Facility - 2K Above Ground Storage Tank Replacement Project, Raleigh, NC

Provide equipment and labor to remove existing 2000-gallon AST. Install new 2000-gallon UL 2085 Fireguard Double Walled AST; install 3" fill piping for remote fill; install product piping; install Wayne dispenser supplied by customer and connect to existing fuel controller. Haul and dispose of all debris.

Post Date: 05/23/2026 Bid Date: 06/23/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Tank & Silo Construction & Controls, Maintenance, Inspections, Repair & Cleaning, Pressure Washing
#825675

RPD Evidence Facility and Fire Station 15 - Special Inspections and Construction Materials Testing, Raleigh, NC

The City of Raleigh invites qualified and experienced firms to submit Requests for Qualifications (RFQ) for construction materials inspection and testing services, and special inspection services for two projects: Project 1: Raleigh Police Evidence Facility. A new facility to be located east of the intersection of Battle Bridge Road and Griffice Mill Road. Project 2: Raleigh Fire Station #15. A new fire station to be located on Spring Forest Road near the current Fire Station #15.

Post Date: 05/23/2026 Bid Date: 06/23/2026 Trades: Material Testing & Monitoring: Includes Radon & Electromechanical, Inspection Services, Inspector of Record (IOR) Services & Testing Laboratories - NAICS 541380
#825681

Force Main Inspection and Maintenance 2026, Cary, NC

A. Contractor services are required to perform the following tasks on the Medfield force main as described in the Contract Documents: a. Remove existing bypass connection and piping b. Installation of pigging access/bypass connection B. Contractor services are required to perform the following tasks on the Rocky Branch and Holly Brook force mains as described in the Contract Documents: a. Pigging of force mains b. Pipe condition inspection of force main using smart pig internal inspection device. c. Access pit(s) for pipe inspection by Engineer. C. Contractor services are required to perform the following tasks on the Forest Oaks force main as described in the Contract Documents: a. Installation of pigging access/bypass connection b. Locate and raise to grade buried ARV manhole c. Locate valve box and raise to grade

Post Date: 05/23/2026 Bid Date: 06/23/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Public Utilities - Water & Sewer Lines: - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
#825685

Water Main Replacement, Cary, NC

Cary is soliciting proposals from qualified engineering firms (Consultant) to assist in the continuation and advancement of our Annual Water Main Replacement program. The selected consultant shall provide engineering services for all phases of the project including survey, design, preparation of construction plans and specifications, construction management, and full time observation.

Post Date: 05/23/2026 Bid Date: 06/23/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#826248

Burlington Lab Renovations Project, Raleigh, NC

The project consists of the renovation of the basement level of the existing four-story Burlington Lab Building on NC State's North Campus. This project will renovate 4,163 square feet of vacated shop space into wet-research labs to accommodate three new research faculty. The project includes architectural, mechanical, electrical, and exhaust modifications and will include the furnishing of labor, material and equipment.

Post Date: 05/27/2026 Bid Date: 06/25/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#826254

Design/Build - New Fire Station Number 2, Morrisville, NC

The scope of work will include but is not limited to the following: Project planning to include code analysis, value engineering options, preliminary cost estimates, and schedule development. Evaluation of the existing site conditions including review of existing surveys and geo-technical evaluations, environmental assessment, and existing utilities. Secure any new or additional studies to address data gaps. Comprehensive project design, to include the building, site, equipment installation, and utilities. Design process will include interfacing with the Town to refine project criteria related to dimensions and performance of the interior and exterior of the facility. Permitting for all aspects of the project though all required agencies. Construction of the project. Project management to assure subcontractors are performing to design and product specifications. Schedule management to assure on-time completion. Cash flow forecasting throughout the duration of the project. Weekly on-site meetings with Town staff for updates. Project closeout, commissioning and handover, delivering manuals, establishing warranties, equipment training, final inspection and acceptance, execution of punch list and record drawings.

Post Date: 05/27/2026 Bid Date: 06/25/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB), *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#826300

Design/Build Services for Sidewalk Improvement Project, Raleigh, NC

The Project will consist of two primary phases. The preconstruction phase (Phase 1) will be comprised of the design services including, but not limited to, those listed below. The preconstruction phase end point will be defined as the submittal to the City of the Design-Built Teams Proposal as defined in the Design Build Agreement attached hereto as part of Appendix IV. Project Management, Roadway Design, Hydraulics Design, Environmental Screening & Permits, Erosion and Sedimentation Control Design, Geotechnical Design, Pavement Management, Right-of-Way Services, Traffic Engineering Design, Utility Coordination & Design, Cost Estimating, Scheduling, Constructability The construction phase (Phase 2) will be comprised of finalizing City approved, Released for Construction (RFC) plans, permits, specifications, and other supporting documents necessary to build the job. This phase will also include support documentation for the City Real Estate (Right-of-Way) team for the City to acquire necessary property rights for construction of the Project, utility relocation, and Project construction.

Post Date: 05/27/2026 Bid Date: 06/25/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB), *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#826444

Pest Control, Raleigh, NC

The Department of Adult Correction (DAC) seeks treatment and control of pests which are currently present in its facilities and buildings and on the adjacent grounds or may reasonably be expected to appear at some point during the course of the contract. Termites and birds are NOT included. The Department of Adult Correction (DAC) requires the following: 1) All pests are included in the coverage except birds and termites. Services to treat for nuisance birds and termite infestations shall be established separately from the scope of this agreement. 2) If the elimination of rodents requires the placement of rodent traps, vendor shall be responsible for supplying, monitoring, and disposing of rodent traps as needed. 3) All buildings (unless excluded by site officials for security reasons) are included in the performance of this contract. 4) All interior areas of each building (unless excluded by site officials for security reasons) are included and shall be subject to monthly treatment. 5) All contiguous, adjacent grounds are included and shall be treated on an as needed basis. The adjacent grounds shall be identified and designated by appropriate site officials (POC), and the frequency of treatment in these areas shall be at the discretion of appropriate site officials. This includes fire ants. Adjacent fields containing livestock and crops are excluded from this contract.

Post Date: 05/28/2026 Bid Date: 06/25/2026 Trades: *Pest Control & Animal Relocation Services: Extermination, Cremation, Termites, Beehives, Rodents: On-Call & Regular Schedule
#827477

Prequalification for New Roof - Materials Support Warehouse, Raleigh, NC

This project involves replacing the existing roof of the 94,750-square-foot Materials Support Warehouse (originally built in 1996 and expanded in 2001). The new roof must be designed for a 2030 year lifespan to protect the universitys storage and surplus goods. The project will follow standard State Construction Office (SCO)procedures.

Post Date: 06/04/2026 Bid Date: 06/26/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards
#826553

4213 Greencastle Court Rehabilitation Project, Raleigh, NC

The Project consists generally of the following major items: mechanical, plumbing, sheetrock, electrical, painting, windows, and exterior stairs.

Post Date: 05/29/2026 Bid Date: 06/30/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#827701

Elevator Modernization - Perry Health Sciences Campus: Building HA, Raleigh, NC

The scope of this project will include full design and construction administration services for the modernization of the two passenger elevators in Building HA on the Perry Health Sciences Campus. One elevator has 5 stops and one elevator has 6 stops. The existing elevators are gearless traction type elevators installed in 2012 with a current history of frequent repairs over the last few years. The modernization scope will include the evaluation for replacement of and/or upgrades to the Elevator Equipment Room, Hoistway (including the gearless hoist machines), Elevator Cars and Elevator Lobbies. In order to fully develop the final scope of work, an existing conditions analysis for the above scope of work will be required on a cost benefit basis.

Post Date: 06/05/2026 Bid Date: 06/30/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB), Elevator Contractor: Installation, Inspections, Maintenance, and Repairs: Vertical Lifts & Dumbwaiters
#827703

Multiple Chiller Replacements - Southern Wake and Perry Health Sciences Campuses, Raleigh, NC

Professional Commissioning Agent services for construction commissioning for the replacement of outdoor air-cooled chillers at the Southern Wake Campus (3 locations) and the Perry Health Sciences Campus (1 location).

Post Date: 06/05/2026 Bid Date: 06/30/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's