#826936
Cowing/Barger/Madison/Smith Waterlines, Silverton, OR
The work includes the following: Approximately 3,525 feet of 8 inch waterline (bid in 4 schedules) including connections, valves, hydrants, water services and appurtenances.
Post Date: 06/02/2026
Bid Date:
06/16/2026
Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras