Post Date | Bid Date | Project ID / Title |
---|---|---|
03/29/2025 | 05/07/2025 | (751429) Cannon Beach Water Resiliency Project Phase 3 - Reservoir Replacement , Cannon Beach, OR |
04/18/2025 | 05/07/2025 | (755174) Royal View Drive North Tank – Water Storage Tank Rehabilitation Project , Seaside, OR |
04/18/2025 | 05/08/2025 | (755165) Fishhawk Road and 7 Driveways to A Depth of 10 Feet , Astoria, OR |
04/24/2025 | 05/23/2025 | (756369) Fairgrounds Roof Rehabilitation , Astoria, OR |
03/22/2025 | 04/10/2025 | (750159) 2025 Capital Projects , Seaside, OR |
04/10/2025 | 04/21/2025 | (753528) Phase 1 Design Work for the Airport Industrial Park Development , Warrenton, OR |
04/03/2025 | 04/24/2025 | (752295) Raw Waterline Replacement RP-2 Project , Warrenton, OR |