Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#828891 Posted 6/14/2026

McKay Pump Replacement, Salem, OR

Owner Reference
2026-1100
Bid Date
Jul 7, 2026 at 02:00pm
Pre-Bid
MANDATORY - 6/17/2026 @ 08:00am @ (for location please or )
Owner
Salem-Keizer School District 24J, OR
Trades
HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Description: Replacement of inline pumps at McKay High School, part of the HVAC system. The project involves investigating and replacing failing inline pumps that circulate water through heating water coils, ensuring they are controlled by the Building Automation System (BAS). The Scope includes replacing pumps, adjusting piping and valving to prevent pump failures, providing seismic bracing, and updating control systems.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 828891 | Published 6/14/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208