McKay Pump Replacement, Salem, OR
- Owner Reference
- 2026-1100
- Bid Date
- Jul 7, 2026 at 02:00pm
- Pre-Bid
- MANDATORY - 6/17/2026 @ 08:00am @ (for location please or )
- Owner
- Salem-Keizer School District 24J, OR
- Trades
- HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Description: Replacement of inline pumps at McKay High School, part of the HVAC system. The project involves investigating and replacing failing inline pumps that circulate water through heating water coils, ensuring they are controlled by the Building Automation System (BAS). The Scope includes replacing pumps, adjusting piping and valving to prevent pump failures, providing seismic bracing, and updating control systems.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 828891 | Published 6/14/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.