Alloway Creek Bridge Reconstruction, Mount Joy Township, PA
The project consists of the superstructure replacement of the bridge carrying SR 2014 over Alloway Creek. The existing structure is a two-span bridge consisting of eight (8) steel I-beams supported on full height concrete abutments and a concrete pier at a 75-degree skew, roadway milling, paving, and barrier replacement, all as indicated on the approved drawings included in the Bid Package for State Route 2014, Section 021, in Adams County, Mount Joy Township, from Segment 0060 Offset 0434 to Segment 0060 Offset 1184, for an overall project length of 550.00 linear feet (0.104 mile).