Rehabilitate Runway 11-29 Jimmy Stewart Airport, Indiana, PA
This project is to rehabilitate the existing Runway 11-29 pavement (approx. 5,500 x 100). The project includes removal of the existing asphalt, preparation of the existing base course, adjustments to the fillet geometry for both end connector taxiways, transition asphalt tie-ins for connector taxiways, installation of a P-401 bituminous surface course, grooving the runway pavement, shoulder grading, light and or underdrain cleanouts adjustment to grade as required, marking the new pavement, and other incidental work required to acceptably complete the project.