To Serve Albemarle Site, North Charleston, SC
- Owner Reference
- ED24ATL0G0394
- Bid Date
- Aug 12, 2026 at 02:00pm
- Owner
- Chester County Wastewater Recovery, SC
- Trades
- Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The work to be done consists of furnishing all materials, equipment, and labor necessary to construct 12-Inch Force Main Along Hwy 9 To Serve Albemarle Site, consisting of the following approximate quantities: 13,578 LF 12-inch C900 Force Main installed by open cut method, 180 LF 12-inch DIP Force Main installed by open cut method, 300 LF of 14-inch HDPE installed by horizontal directional drill, 10 air release valves, connecting to existing pump station number 2 and appurtenances.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 832301 | Published 7/8/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208